Friday, October 29, 2010

The House Is FINALLY coming along!

counter tops = 90% finished ( cant wait to start cooking)
back splash = 85% finished (looking amazing I want a full wall of it)
cabinets = 90% finished ( perfect color although I would have loved to try an orange color)Walls re textured= 100%
paint on walls= 100% (love it)
baseboards = 10% (i try to get Justin moving but he pretty much just laughs at me)
tile on the floor = 40% ( still have to get used to it but everyone seems to like it)



       It is getting really exciting to see how everything is coming together. I am so happy with our kitchen! we finally picked out a microwave (after 3 months of not having one) and installed it.  The sink and faucet are installed but Justin hasn't hooked up the hot water yet (now I don't have to do the dishes in the bathtub :D) But all in all its looking better then I could have pictured!!!
      I am just hoping to have it done before Dec 1 (Justin Promised) for bookclub at my house!!



Pictures will soon follow I promise!!!